Ruidoso Sewer Project Weekly Tailgate Meetings
Join us for weekly tailgate meetings to address community questions or concerns relevant to the Ruidoso Sewer Line Interceptor Project.
When: Every Tuesday at 4:30 p.m.
Where: Main Road Bridge 2, corner of Main Road and Fox Drive
Why: To Address Questions and/or Concerns
Who: Everyone is welcome.
Ruidoso Sewer Line Rehabilitation Project Update
Survey crews will be working for the Village of Ruidoso to support the construction of the Hazard Mitigation phase in the Upper Canyon area beginning on Monday, August 8, 2022. Current survey work will be limited to the area along the river between 627 Main Road and 828 Main Road.
Lane Closures: Sudderth Drive May 16 - 19, 2022
Beginning May 16 to May 19, 2022, from 6:00 p.m. to 12:00 a.m., the Village of Ruidoso will be performing sewer line maintenance on the main sewer lines on Sudderth Drive at the circle to Raines Road near Lincoln County Medical Center. The road will have one lane closed where the maintenance will be performed (manholes).
Lane Closures: Mechem Drive May 9 - 12, 2022
Beginning May 9, 2022, at 6:00 p.m. the Village of Ruidoso will be performing sewer line maintenance on Mechem Drive from the Alpine Village turnoff to Sudderth Dr. which will have one lane closed. The road and lane closures will continue through May 12 or until the work has been completed.
Traffic Control Notice: March 21 - April 27, 2022
Village residents can expect work to continue on the Ruidoso Sewer Project Beginning on March 21, 2022, crews from SAK Construction will be performing maintenance on sewer lines within the area of Fern Trail in the Village of Ruidoso. The work will continue through April 27, 2022. This construction is weather dependent and therefore subject to change.
Resource Sheet: The Value and Use of Native Vegetation
This resource sheet provides information on the value and use of establishing vegetation on streambanks to stabilize the soil and slow erosion.
Ruidoso Sewer Project: Tree Removal Revegetation Information
This presentation by Molzen Corbin is meant to guide you through the tree removal and revegetation process of the Ruidoso Sewer Project Hazard Mitigation Phase.
Road Closure to Begin Tuesday, January 18, 2022
The Street Department will be doing a culvert installation on Gavilan Canyon Road near the intersection of Homestead Loop. The road will be closed until work is finished. Residents will be able to access their homes between Warrior and Cemetery.. Detours will be at Gavilan and Warrior and Gavilan and Hull. Watch for street crews working, approach with caution.
Street Closures: August 30 - September 8, 2021
The week of August 30 - September 3, 2021, MP Chavez will continue working on the pipe construction located at the intersection of River Trail and Country Club. Tuesday and Wednesday, September 7-8, we will be working on the point of repair located at 103 North Loop. Please look for signs indicating which road and lane will be closed. Approach the area with caution, at a very slow speed, and watch for employees directing traffic.
Street Closure: August 16 - 19, 2021
Beginning August 16 through August 19 from 6:00 pm to 12:00 am, the Village of Ruidoso will be performing maintenance on the main sewer lines on Mechem Drive from the turnoff to Alpine Village to Sudderth Drive. The road will be one lane throughout Mechem Drive at different areas where the maintenance will be performed (manholes). Please approach the area with caution and at a low rate of speed.
Street Closure: July 27 - August 6, 2021
Beginning July 27, 2021, crews from MP Chavez will be working on River Trail between Country Club Drive and River Trail on new construction until their anticipated completion on August 6. Please approach the area with caution and at a low rate of speed.
Street Closure: May 24, 2021
Beginning May 24 at 8:00 a.m., the Village of Ruidoso will be repairing a sewer line on Gavilan Canyon Road. The road and lane closures will continue until the work has been completed. Approach the area with caution, at a very slow speed, and watch for employees directing traffic.
Street Closure: May 18 - 20, 2021
Beginning May 18 at 8:00 a.m., the Village of Ruidoso will be repairing a sewer line on Burro Lane which will be closed. The 2800 block of Sudderth Drive will have one lane closed on the outside eastbound side of Burro Lane. The road and lane closures will continue through May 20 or until the work has been completed.
Street Closure: April 29 - 30, 2021
Work will continue on the Sewer Line Repair Project from April 29, 30 with traffic control in the area of Gavilan Canyon Road and Meander Dr. as indicated in the included map. Please approach the area with caution and at a low rate of speed.
Street Closure: May 3 - 8, 2021
Work will continue on the Sewer Line Repair Project from May 3 - 8, 2021, with traffic control in the area of Gavilan Canyon Road, Meander, and Reese Drives as indicated in the included map. Please approach the area with caution and at a low rate of speed.
Street Closure: April 8 - 10, 2021
Work will continue on the Sewer Line Repair Project from April 8-10 in the area of Highlands Lane to Center Lane. No traffic control will be required as the manholes being serviced in that area are located out of the right-of-way. Please approach the area with caution and at a low rate of speed.
Street Closure: April 1, 2021
On Thursday, April 1, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following map for specific street and date details. *The SAK Manhole Crew will have a 2-week break from March 20-April 5, 2021.
Street Closure: March 25, 2021 (Rescheduled from March 27)
On Thursday, March 25, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following map for specific street and date details. *The SAK Manhole Crew will have a 2 week break from March 20-April 5, 2021.
Street Closures: March 15 - 20, 2021
Beginning on March 15, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through March 20, 2021. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.
Street Closures: March 8 - 13, 2021
Beginning on March 8, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through March 13, 2021. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.