Cree Meadows Trail: First Alignment Presentation
The following First Alignment report presented at the public meeting on March 9, 2020, details project scope and schedule and completes the conceptualization and criteria design. It includes a narrative of design requirements and preliminary design drawings that establish the project Basis of Design (BOD). While drawings are included in the First Alignment package, they are not final construction drawings. At this phase, the drawings incorporate the requirements established by Village stakeholders with the intended design direction to guide the project progress.