Resource Sheet: The Value and Use of Native Vegetation
This resource sheet provides information on the value and use of establishing vegetation on streambanks to stabilize the soil and slow erosion.
Street Closures: August 30 - September 8, 2021
The week of August 30 - September 3, 2021, MP Chavez will continue working on the pipe construction located at the intersection of River Trail and Country Club. Tuesday and Wednesday, September 7-8, we will be working on the point of repair located at 103 North Loop. Please look for signs indicating which road and lane will be closed. Approach the area with caution, at a very slow speed, and watch for employees directing traffic.
Street Closure: August 16 - 19, 2021
Beginning August 16 through August 19 from 6:00 pm to 12:00 am, the Village of Ruidoso will be performing maintenance on the main sewer lines on Mechem Drive from the turnoff to Alpine Village to Sudderth Drive. The road will be one lane throughout Mechem Drive at different areas where the maintenance will be performed (manholes). Please approach the area with caution and at a low rate of speed.
Street Closure: July 27 - August 6, 2021
Beginning July 27, 2021, crews from MP Chavez will be working on River Trail between Country Club Drive and River Trail on new construction until their anticipated completion on August 6. Please approach the area with caution and at a low rate of speed.
Street Closure: April 29 - 30, 2021
Work will continue on the Sewer Line Repair Project from April 29, 30 with traffic control in the area of Gavilan Canyon Road and Meander Dr. as indicated in the included map. Please approach the area with caution and at a low rate of speed.
Street Closure: May 3 - 8, 2021
Work will continue on the Sewer Line Repair Project from May 3 - 8, 2021, with traffic control in the area of Gavilan Canyon Road, Meander, and Reese Drives as indicated in the included map. Please approach the area with caution and at a low rate of speed.
Street Closure: April 8 - 10, 2021
Work will continue on the Sewer Line Repair Project from April 8-10 in the area of Highlands Lane to Center Lane. No traffic control will be required as the manholes being serviced in that area are located out of the right-of-way. Please approach the area with caution and at a low rate of speed.
Street Closure: April 1, 2021
On Thursday, April 1, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following map for specific street and date details. *The SAK Manhole Crew will have a 2-week break from March 20-April 5, 2021.
Street Closure: March 25, 2021 (Rescheduled from March 27)
On Thursday, March 25, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following map for specific street and date details. *The SAK Manhole Crew will have a 2 week break from March 20-April 5, 2021.
Street Closures: March 15 - 20, 2021
Beginning on March 15, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through March 20, 2021. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.
Street Closures: March 8 - 13, 2021
Beginning on March 8, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through March 13, 2021. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.
Street Closures: February 17 - 18, 2021
Beginning on February 17, 2021, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through February 18, 2021. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.
Robin Road Will Be Closed to Thru Traffic January 5 - 7, 2021
SAK Construction will be working on sewer maintenance in the area of Robin Road in Ruidoso from January 5 - 7, 2021, as indicated by the included map. During this time, you may hear noises from equipment, trucks, and pumps. Please use caution when around the work area.
Street Closures: December 16 - 17, 2020
On December 16, 2020, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through December 17, 2020. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following map for specific street and date details.
Street Closures: December 7 - 12, 2020
Beginning on December 7, 2020, crews from SAK Construction will be performing maintenance on sewer lines within the Village of Ruidoso. The work will continue through December 12, 2020. Please look for signs indicating that crews are working and approach the areas with caution. Please reference the following maps for specific street and date details.
Construction Begins on Ruidoso Sewer Line Interceptor Project - November 12, 2020
Construction on the Ruidoso Sewer Line Interceptor Project begins Thursday, November 12, 2020, as SAK Construction begins installing a special liner inside the existing sewer main to renew the sewer quickly and without excavation. Crews will begin this process in the area of Mechem and Sudderth behind Allsup’s. A list of addresses that will be affected can be found at RuidosoSewerProject.com.
Lane Closures On Mechem Drive For Sewer Line Maintenance
The Village of Ruidoso has scheduled sewer line maintenance street works on Mechem Drive beginning on Monday, August 17, 2020, through Thursday, August 20, 2020. The work will be conducted between the hours of 6:00 PM and 12:00 AM beginning at Alpine Village Road to the intersection of Mechem and Sudderth (weather permitting). During these times, drivers may encounter a single lane closure where work is being performed.
Lane Closures On Sudderth Drive For Sewer Line Maintenance
The Village of Ruidoso has scheduled sewer line maintenance street works on Sudderth Drive beginning Monday, August 24, 2020, through Thursday, August 27, 2020. The work will be conducted between the hours of 6:00 PM and 12:00 AM beginning at Main Road traffic circle to Raines Road. (weather permitting). During these times, drivers may encounter a single lane closure where work is being performed.
Ruidoso Sewer Project Easement Update
Over the next few weeks, the Village of Ruidoso will be sending out updated or revised letters to property where utility easements will be needed for the Restoration Phase and the Lift Station Phase.
Feb 17-20, 2020 Sewer Line Maintenance Sudderth & Mechem Drive
Beginning February 17, 2020, through February 20, 2020, at 6:00 pm until Midnight each day, the Village of Ruidoso will be performing maintenance on the main sewer lines on Mechem and Sudderth Drives. Please look for signs indicating which lane will be closed. Approach the area with caution at a very slow speed and watch for employees directing traffic.