IFB #2022-001B Grindstone Canyon Dam Seepage Gallery Drain Cleaning/Restoration Project

Project Description: The Work under this Contract consists of the following:

1.       Gallery Floor Grading and Removal of PVC Pipe

2.       Dam Foundation and Abutment Relief Drain Cleaning

3.       Dam Ceiling Relief Drain Cleaning

4.       Drain Hole Reaming (Optional)

5.       Video Inspection of Drains

6.       Removable Weir Fabrication and Installation

7.       Minimum Equipment Requirements, not limited to:

a. Video equipment and accessories for inspection of the drain pipes.

b. Water jetting equipment and accessories.

c. Reaming equipment and accessories.

d. Water flow measuring devices and accessories.

e. Pressure gauges with suitable packers.

f. Alternative water pressure measuring and monitoring devices.

g. Other data-gathering equipment as required.

h. Suitable depth measuring devices.

Bid status: Awarded to Beartooth Water Jetting and Video Inspection, LLC.

Previous
Previous

IFB #2022-002B Paradise Canyon Lateral Replacement

Next
Next

RFP #2022-004P: Professional Engineering for Master Planning and Rate Analysis